Me again!
I’ve not had as much time as I’d like to work on the unit over Christmas/new year. I suppose that’s a good thing though, I’ve kept pretty busy when I wasn’t expecting much, anyways...
I did get a chance to paint the floor in the new area of the unit and a few other bits and bobs!
First up was to fit some skirting board to the bottom of the partition to finish it off a little better.

Then as you can see the floor needs painting badly, but it’s only at this stage I’ve had chance. So, I cleared the floor area, gave it a scrape to bring up any flaking paint, degreased it, scrubbed it, rinsed and dried. Then Left for 24 hours.

The next step was to do the edges with a brush. The walls in places were painted in keeping with the rest of the unit, one breeze block course.


And done...


Now everything back in place. I’ve left a line just in case I needed anything from the back whilst it was drying. I’ll be doing that at some point this week. I can get that done inside 5 mins with a roller. I can do it without worrying about taping anything up also, which will make it a lot easier!

You’ll Notice my new tool chest too! I love it!
More updates to come soon!
Jay