I have now plastic welded/fiber glassed and filled the valance and bumper, they are at the body shop getting sprayed, hopefully have them back on Friday.
Exhaust is fully welded up and the valve linkage is set up with the stepper motor. Reed switch is yet to be installed, will hopefully have that done by Wednesday along with routing the wires and installing the LED.
Next weekend will be fitting the bumper, welding on the hangers and the tip. Still undecided whether to go straight cut or slash cut