Pushing on. Really had enough now. Cutting a circle in perspex is an absolute PITA.
Got the thermostat in. 21 deg lol.
Started messing with some lighting. Will need a lot more LED strips by the looks of it.
Still need to stick the three layers of the false floor together can see this being a nightmare as its a very tight fit.