Thanks for the advice.
I already had in mind making up separate looms, glad its not a silly idea now.
I've got a wiring diagram, but anything else that goes together and helps would be great.
What size wire did you use? I think im going to use 1mm, but reckon 0.5mm would be fine.......
As far as cost goes, its not going to cost anywhere near the £89.00 (+ p+p) that kufatec charge.
The 2 sensor plugs and control module plug - £8
Control module pins (min 100!
) - £6
A 100m roll of cable shouldn't cost me anything, but worst case £10 - £15
Couple of rolls of 'fluffy' tape won't cost me anything.
Had a look at the sensors tonight, just need to work out which ones which and how they go on
Cheers